Our business offices will be closed on Monday, September 2 to observe the US Labor Day legal holiday. As always, we’ll provide same-day support for time-sensitive issues via our ticket and e-mail systems. However, questions that aren’t time-sensitive (including most billing matters) may not be answered until Tuesday, and telephone support (via callbacks) will be available only for urgent issues.
The PHP developers recently released versions 7.1.31, 7.2.21 and 7.3.8 that fix several bugs. We’ve upgraded the PHP 7.1, 7.2 and 7.3 series on our servers as a result.
These changes should not be noticeable, but as always, don’t hesitate to contact us if you have any trouble.
Between 4:06 PM and 5:03 PM Pacific time today (Aug 22, 2019), sites hosted on the “web08” server were intermittently unavailable due to a technical problem.
The problem was caused by a flood of connections that our systems failed to automatically block as they should. We’ve modified the software that handles this, and we do not expect the problem to recur.
We sincerely apologize to customers affected by this problem; we don’t consider it normal or acceptable, and strive to avoid incidents like this.
Update August 21, 2019: The maintenance described below has been completed for all sites.
Over the next few weeks, we’ll be retiring some old servers and moving sites on those servers to new (often faster) ones. Migrating a site takes just a few seconds in most cases, so it’s likely that neither you nor your visitors will notice this happening.
If someone does view your site while it’s being migrated, they’ll see a maintenance screen with a link to this blog post, like this:
If your site is in the small minority that has a large database (more than a few hundred MB), the migration could take a little longer — perhaps a few minutes. We try to do migrations during slow periods for each site, minimizing the impact on visitors.